IPO details
- Price band
- โน88.0 โ โน93.0
- Lot size
- 1,200 shares
- Minimum investment
- โน2,11,200 / 2,400 shares (2 Lots)
- Subscription
- 0.69x
- Issue dates
- 2026-10-23 โ 2026-10-27
- Listing date
- 2026-10-30
- Issue size
- โน54.82 Cr
- IPO document
- RHP PDF
Live Grey Market Premium, subscription demand, price band & listing estimates
Core4 Engineers is an engineering, procurement, construction and commissioning (EPCC) company engaged in railway infrastructure, power transmission and distribution, and water and wastewater treatment projects. The company operates across five business segments: railway electrification and infrastructure, extra high-tension transmission and distribution systems, water and wastewater treatment, automation and SCADA systems, and high-tension and low-tension electrical panels and compact substations. Its railway infrastructure services include overhead electrification, traction substations, signalling interfaces, station redevelopment, and allied civil works. Its power transmission and distribution projects cover substations, transmission lines, and distribution networks up to 220 kV. The company also undertakes turnkey projects for water treatment plants, sewage treatment plants, and effluent treatment plants. Its automation services include PLC-based systems, remote monitoring, and control solutions. The company manufactures HT and LT electrical panels and compact substations with capacities up to 2.5 MVA and voltage levels up to 11 kV at its in-house manufacturing facility.
No current GMP quote has been reported yet.
GMP is unofficial and speculative; it does not guarantee listing performance.
Track verified daily closing grey market snapshots, price progression, and estimated listing expectations leading up to exchange debut:
| Date | IPO GMP (โน) | Day's Movement | Est. Listing Price | Est. Gain (%) | Source Freshness |
|---|---|---|---|---|---|
| 2026-10-23 | โน0.00 | โ Flat (โน0.00) | โน93.00 | 0.00% | 23-Oct 18:00 (Archive) |
| 2026-10-22 | โน0.00 | โก Base Rate | โน93.00 | 0.00% | 22-Oct 17:00 (Archive) |
Grey Market Premium (GMP) data reflects unofficial over-the-counter quotes between private brokers. It does not represent guaranteed exchange pricing or SEBI-regulated trading.
As per latest market dealer indications, Core4 Engineer IPO Grey Market Premium (GMP) is recorded at โนNot Available. Grey market premium is unofficial, speculative, and subject to rapid change.
Estimated listing price is calculated by adding the upper price band to the prevailing GMP once official bands and GMP are confirmed.
The issue bidding opens on 2026-10-23 and closes on 2026-10-27. The tentative listing date on the exchanges is 2026-10-30.
The price band is โน88.0 to โน93.0 per equity share. The minimum bid lot size is 1,200 shares, requiring a minimum investment of โน2,11,200 / 2,400 shares (2 Lots).
Once the basis of allotment is finalized, you can verify your allotment status online on our IPO Allotment Portal, the official registrar, or directly through BSE and NSE using your PAN card number.